Main information
- Price: 640 million VND
- Use Area: 80 m2
- Land Area: 80 m2
- Publish Date: 03/11/2017
- Property Code: 2289483
- Bedrooms:
- Restrooms:
- Legal: Residence Disclosure document
- Direction: N/A
Description
** Location: With the advantage of the adjacent University Village 2, connecting Phuoc Thien residential area, VinCity complex with the total area of over 300ha. (Long Dai Bridge was started on 22/3/2017 marked the strong development of Long Phuoc). * Diverse area: 80m2,100m2,120m2,140m2 .. * Legal: Completed 100% Have separate pink book. + Notarized transfer within the day, Free construction. + No height of construction. No infrastructure required. * Infrastructure: 9m road system, 13m with 1.5m-3m pavement. + Finished infrastructure, full water and electricity. *** Utility land: - Long Dai Bridge located on the ring road 3 will be completed in 2019 through the Tan Van fork. High-Tech Park 2 has started construction in early 2018. - Long Giay Expressway connects to Long Xuyen Line - Long Phuoc Medical Center, Market, Long Phuoc School, coopmart, vincom. * Contact me when you really care. I will explain all your questions to you.
Hoàng Thụ
Joined: 7 years 1 months
Favourite
Report error