Main information

  • Price: 9.6 billion VND
  • Use Area: 800 m2
  • Land Area: 800 m2
  • Publish Date: 11/04/2018
  • Property Code: 2486675
  • Bedrooms:
  • Restrooms:
  • Legal: Residence Disclosure document
  • Direction: South

Description

- Hometown will be the place to find people after the chaos of life, need a quiet life. That is the taste of the mother river with the rustling of green trees straight blowing into a new soul wind - Phu Hoang Gia will create that - belonging to the project on the river bank Vam Co with the size of 70ha under new urban area of ​​250 ha in the south gate of Saigon. National road 1A, Highway 62, Ho Chi Minh City-Trung Luong expressway is the route has been put into use and these roads are now overloaded, so the next time the expressway Long-Long Thanh The project is expected to start in 2018 with a total length of 58.3 km and the 134km-long Ho Chi Minh City-Tan An-Can Tho railway (expected in 2025) will be put into operation to reduce the current overload.
Trần Vy
Trần Vy
Joined: 6 years 10 months

Utilities