Main information
- Price: 9.6 billion VND
- Use Area: 800 m2
- Land Area: 800 m2
- Publish Date: 11/04/2018
- Property Code: 2486675
- Bedrooms:
- Restrooms:
- Legal: Residence Disclosure document
- Direction: South
Description
- Hometown will be the place to find people after the chaos of life, need a quiet life. That is the taste of the mother river with the rustling of green trees straight blowing into a new soul wind - Phu Hoang Gia will create that - belonging to the project on the river bank Vam Co with the size of 70ha under new urban area of 250 ha in the south gate of Saigon. National road 1A, Highway 62, Ho Chi Minh City-Trung Luong expressway is the route has been put into use and these roads are now overloaded, so the next time the expressway Long-Long Thanh The project is expected to start in 2018 with a total length of 58.3 km and the 134km-long Ho Chi Minh City-Tan An-Can Tho railway (expected in 2025) will be put into operation to reduce the current overload.
Trần Vy
Joined: 6 years 10 months
Favourite
Report error