![](https://cloud.mogi.vn/images/201803/28/815/5eafd990c0dc4c31bf9385cea496b05a.jpg)
![](https://cloud.mogi.vn/images/201803/28/815/ffa900b56f464c07a82f85ee6a9bd9a3.jpg)
![](https://cloud.mogi.vn/images/201803/28/815/2b67df5d86a447488a36258e594aea0b.jpg)
![](https://cloud.mogi.vn/images/201803/28/815/b344801ff90e4e35b0d5dd4fd922e157.jpg)
![](https://cloud.mogi.vn/images/201803/28/815/90ae3fc09e334794b91f3581bba40972.jpg)
Main information
- Price: 1.7 billion VND
- Use Area: 100 m2
- Land Area: 100 m2
- Publish Date: 28/03/2018
- Property Code: 2463951
- Bedrooms:
- Restrooms:
- Legal: Residence Disclosure document
- Direction: East
Description
- Nguyen Thi Dinh frontage is the bridge connecting the provinces of Q1, Q2 in Ho Chi Minh City. - Adjacent to the industrial zone in the East of the city. - The 2km Cat Lai Bridge project is expected to be started and constructed by the end of 2017. - The residential area is located in the urban area of the East of the city. Legal - Payment: - Pink book of each background, permanently owned. - Long-term flexible payment of 6-8 months with 0% interest rate commitment. - Area: Diversity: 5 x 16m, 5 x 20m, 5 x 24m, 10 x 25m. - 100% residential land, full of papers, pink books in each floor. Building height limits. Gadgets + Powerups. - Infrastructure: electricity, tap water, pavement, asphalted road, 100% green park. - 5 minutes from the industrial zone with 200,000 workers + engineers to live and work in the business of trading + building rooms for rent - 20% profit opportunity / 3 months. Contact: NHU-0938029382.For more information.
![trần nhu](/content/images/avatar.png)
trần nhu
Joined: 6 years 11 months
Favourite
Report error